Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0193 #09 Y:2017 Install timers and/or thermostats $464 $2,000
TT0193 #08 Y:2017 Eliminate or reduce compressed air usage $949 $125
TT0193 #07 Y:2017 Develop a repair/replace policy $1,978 $4,283
TT0193 #06 Y:2017 Install common header on compressors $3,186 $8,600
TT0193 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $4,550 $3,000
TT0193 #04 Y:2017 Upgrade controls on compressors $5,162 $360
TT0193 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $8,088 $22,470
TT0193 #02 Y:2017 Utilize energy-efficient belts and other improved mechanisms $12,374 $32,000
TT0193 #01 Y:2017 Insulate bare equipment $35,857 $10,000
DL0174 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $15,220 $34,080
DL0174 #08 Y:2017 Use flow control valves on equipment to optimize water use $630 $2,000
DL0174 #07 Y:2017 Use or replace with energy efficient substitutes $10,500 $25,000
DL0174 #06 Y:2017 Minimize operation of equipment maintained in standby condition $10,800 -
DL0174 #05 Y:2017 Isolate steam lines to avoid heating air conditioned areas $5,100 $10,000
DL0174 #04 Y:2017 Use or replace with energy efficient substitutes $3,550 $8,000
DL0174 #03 Y:2017 Turn off equipment during breaks, reduce operating time $5,810 $6,000
DL0174 #02 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $10,710 $18,000
DL0174 #01 Y:2017 Turn off equipment during breaks, reduce operating time $3,170 $4,000
UF0505 #08 Y:2016 Repair and eliminate steam leaks $4,554 $1,592
UF0505 #07 Y:2016 Preheat boiler makeup water with waste process heat $7,374 $4,000