Assessment Year | 2017 |
---|---|
Principal Product | Resins and Paper Chemicals |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 57 |
Plant Area |
4,356,000
ft2
|
Annual Production | 88,330,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $511,394 | 4,855,546 |
kWh
|
$0.11 | |
Natural Gas | $391,998 | 131,986 |
MMBtu
|
$2.97 | |
Waste Disposal Costs | |||||
Water Usage | $15,383 | 4,193 |
Tgal
|
$3.67 | |
Water Disposal | $172,359 | 20,145 |
Tgal
|
$8.56 | |
TOTAL YEARLY COSTS | $1,091,134 | ||||
RECOMMENDED SAVINGS* | $933,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $197,786 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $715,231 | $1,700,000 |
$905,580
8,600,000
kWh
|
$(-87,149.0)
-
MMBtu
|
- | - | $(-103,200.0) | |
02 | 2.1224: Replace boiler | $152,736 | $200,000 | - |
$152,736
-
MMBtu
|
- | - | - | |
03 | 2.2121: Increase amount of condensate returned | $18,902 | $2,800 | - |
$5,527
-
MMBtu
|
$4,023
-
Tgal
|
$9,352
-
Tgal
|
- | |
04 | 2.4156: Establish a preventative maintenance program | $13,763 | $120 |
$13,763
130,699
kWh
|
- | - | - | - | |
05 | 2.1222: Install turbulators | $12,705 | $7,500 | - |
$12,705
-
MMBtu
|
- | - | - | |
06 | 2.2135: Repair and eliminate steam leaks | $7,831 | $1,081 | - |
$7,831
-
MMBtu
|
- | - | - | |
07 | 2.2441: Preheat boiler makeup water with waste process heat | $7,374 | $4,000 | - |
$7,374
-
MMBtu
|
- | - | - | |
08 | 2.2135: Repair and eliminate steam leaks | $4,554 | $1,592 | - |
$3,669
-
MMBtu
|
$266
-
Tgal
|
$619
-
Tgal
|
- | |
TOTAL RECOMMENDED | $933,096 | $1,917,093 |
$919,343
8,730,699
kWh
|
$102,693
-
MMBtu
|
$4,289
-
Tgal
|
$9,971
-
Tgal
|
$(-103,200.0) | ||
TOTAL IMPLEMENTED | $197,786 | $205,593 |
$13,763
130,699
kWh
|
$169,763
-
MMBtu
|
$4,289
-
Tgal
|
$9,971
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs