Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,785

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1003 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $761 $545
AM1003 #02 Y:2026 Meter recycled water (to reduce sewer charges) $40,935 -
AM1003 #01 Y:2026 Optimize plant power factor $5,740 $10,270
UL2616 #07 Y:2026 Install waste heat boiler to produce steam $2,606 $11,000
UL2616 #06 Y:2026 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,404 $720
UL2616 #05 Y:2026 Use solar heat to make electricty $29,169 $222,999
UL2616 #04 Y:2026 Install / repair insulation on steam lines $30 $80
UL2616 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,932 $3,420
UL2616 #02 Y:2026 Upgrade conveyors $730 $1,050
UL2616 #01 Y:2026 Close holes and openings in building such as broken windows $3,302 $870
SD0700 #12 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,040 $2,389
SD0700 #11 Y:2026 Insulate bare equipment $23,068 $6,000
SD0700 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $26,256 $13,966
SD0700 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $30,685 -
SD0700 #08 Y:2026 Use battery storage for demand control $43,016 $105,896
SD0700 #07 Y:2026 Use solar heat to make electricty $117,149 $276,500
SD0700 #06 Y:2026 Use most efficient type of electric motors $26,086 $12,918
SD0700 #05 Y:2026 Eliminate or reduce compressed air usage $3,579 $4,156
SD0700 #04 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $2,072 $2,000
SD0700 #03 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $922 $1,000