| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SJ0057 #04 Y:2026 | 04 | 2026 | Recover waste heat from equipment | $4,351 | $4,420 |
n/a
|
| SJ0057 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,628 | - |
n/a
|
| SJ0057 #02 Y:2026 | 02 | 2026 | Install compressor air intakes in coolest locations | $492 | $1,850 |
n/a
|
| SJ0057 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $767 | - |
n/a
|
| SJ0056 #09 Y:2026 | 09 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $587 | $100 |
n/a
|
| SJ0056 #08 Y:2026 | 08 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,009 | $2,699 |
n/a
|
| SJ0056 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $18,161 | $65,038 |
n/a
|
| SJ0056 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $212,681 | $1,044,647 |
n/a
|
| SJ0056 #05 Y:2026 | 05 | 2026 | User battery storage for power quality issues | $252,404 | $694,340 |
n/a
|
| SJ0056 #04 Y:2026 | 04 | 2026 | Preheat boiler makeup water with waste process heat | $29,218 | $8,641 |
n/a
|
| SJ0056 #03 Y:2026 | 03 | 2026 | Install compressor air intakes in coolest locations | $914 | $2,155 |
n/a
|
| SJ0056 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,694 | - |
n/a
|
| SJ0056 #01 Y:2026 | 01 | 2026 | Insulate bare equipment | $228 | $81 |
n/a
|
| CI0092 #09 Y:2026 | 09 | 2026 | Reduce the pressure of compressed air to the minimum required | $585 | - |
n/a
|
| CI0092 #08 Y:2026 | 08 | 2026 | Turn off equipment during breaks, reduce operating time | $1,364 | $2,000 |
n/a
|
| CI0092 #07 Y:2026 | 07 | 2026 | Use photocell controls | $1,530 | $930 |
n/a
|
| CI0092 #06 Y:2026 | 06 | 2026 | Upgrade obsolete equipment | $1,647 | $25,000 |
n/a
|
| CI0092 #05 Y:2026 | 05 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $2,629 | $1,000 |
n/a
|
| CI0092 #04 Y:2026 | 04 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $3,149 | $19,000 |
n/a
|
| CI0092 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $12,136 | $56,000 |
n/a
|