ITAC Assessment: CI0092
ITAC logo
ITAC Assessment: CI0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Overlays, Labels, Membrane Switches
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 14,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,982 204,571
kWh
Electricity Demand $28,742 1,896
kW-mo/yr
Electricity Fees $7,961 -
LPG $4,992 114
MMBtu
TOTAL YEARLY COSTS $73,677
RECOMMENDED SAVINGS* $66,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 4.112: Replace old machine with new automatic multi-station tool $27,870 $90,000 $27,870
17,940
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,811 $4,500 $10,594
66,212
kWh
$5,217
-
kW-mo/yr
- - -
03 2.9114: Use solar heat to make electricty $12,136 $56,000 $11,411
72,990
kWh
$725
-
kW-mo/yr
- - -
04 2.8227: Adjust / maintain fork lift trucks for most efficient operation $3,149 $19,000 $(-1,843.0)
(-11,520)
kWh
- $4,992
-
MMBtu
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,629 $1,000 - $2,629
-
kW-mo/yr
- - -
06 2.4321: Upgrade obsolete equipment $1,647 $25,000 $1,647
10,296
kWh
- - - -
07 2.7134: Use photocell controls $1,530 $930 $898
5,610
kWh
$541
-
kW-mo/yr
- $70 $21
08 2.6212: Turn off equipment during breaks, reduce operating time $1,364 $2,000 - $1,364
-
kW-mo/yr
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $585 - $315
2,368
kWh
$270
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $66,721 $198,430 $50,892
163,896
kWh
$10,746
-
kW-mo/yr
$4,992
-
MMBtu
$70 $21
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs