ITAC Assessment: AS0519
ITAC logo
ITAC Assessment: AS0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Manufactured Homes
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 220,405
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,154
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,327 1,117,360
kWh
Electricity Demand $40,943 4,790
kW-mo/yr
Electricity Fees $15,563 -
TOTAL YEARLY COSTS $160,833
RECOMMENDED SAVINGS* $126,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $113,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $65,138 $509,120 $48,749
521,941
kWh
$16,389
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,335 $11,420 $26,958
288,638
kWh
$3,377
-
kW-mo/yr
- -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $12,742 $43,469 $(-2,638.0)
(-28,247)
kWh
- $15,380
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,189 $17,273 $8,286
88,708
kWh
$1,814
-
kW-mo/yr
- $1,089
05 2.7226: Use computer programs to optimize hvac performance $4,322 $7,738 $3,142
33,641
kWh
$1,180
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,247 $3,455 $1,997
21,384
kWh
$250
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $352 $830 $312
3,344
kWh
$40
-
kW-mo/yr
- -
TOTAL RECOMMENDED $126,325 $593,305 $86,806
929,409
kWh
$23,050
-
kW-mo/yr
$15,380
-
MMBtu
$1,089
TOTAL IMPLEMENTED $113,583 $549,836 $89,444
957,656
kWh
$23,050
-
kW-mo/yr
- $1,089
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs