ITAC Assessment: SJ0056
ITAC logo
ITAC Assessment: SJ0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Chocolate covered macadamia nut candies
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 65,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $739,606 2,347,587
kWh
Electricity Demand $79,976 6,350
kW-mo/yr
TOTAL YEARLY COSTS $819,582
RECOMMENDED SAVINGS* $521,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.2511: Insulate bare equipment $228 $81 $208
661
kWh
$20
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,694 - $4,455
14,144
kWh
$239
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $914 $2,155 $914
2,901
kWh
- -
04 2.2441: Preheat boiler makeup water with waste process heat $29,218 $8,641 $29,218
92,757
kWh
- -
05 2.3142: User battery storage for power quality issues $252,404 $694,340 - - $252,404
06 2.9114: Use solar heat to make electricty $212,681 $1,044,647 $208,589
662,188
kWh
$4,092
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $18,161 $65,038 $17,224
54,680
kWh
$937
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,009 $2,699 $2,854
9,061
kWh
$155
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $587 $100 $557
1,768
kWh
$30
-
kW-mo/yr
-
TOTAL RECOMMENDED $521,896 $1,817,701 $264,019
838,160
kWh
$5,473
-
kW-mo/yr
$252,404
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs