Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,795

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0357 #08 Y:2026 Reduce the pressure of compressed air to the minimum required $3,817 $31
TT0357 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,611 $22,500
TT0357 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,947 $5,000
TT0357 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,880 $1,500
TT0357 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,816 $30,000
TT0357 #03 Y:2026 Use / purchase optimum sized compressor $18,291 $80,000
TT0357 #02 Y:2026 Meter waste water $20,750 $5,000
TT0357 #01 Y:2026 Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $112,051 $500,000
MS0464 #06 Y:2026 Turn off equipment when not in use $13,526 -
MS0464 #05 Y:2026 Apply for tax-free status for energy purchases $5,325 -
MS0464 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,762 $2,243
MS0464 #03 Y:2026 Eliminate/reduce an operation $1,157 -
MS0464 #02 Y:2026 Air condition only space necessary $65,105 $17,298
MS0464 #01 Y:2026 Optimize plant power factor $14,662 $50,000
IC0343 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $554 $7,901
IC0343 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $316 $1,477
IC0343 #07 Y:2026 Use radiant heater for spot heating $700 $10,000
IC0343 #06 Y:2026 Use solar heat to make electricty $89,645 $370,298
IC0343 #05 Y:2026 Turn off equipment during breaks, reduce operating time $2,730 -
IC0343 #04 Y:2026 Insulate bare equipment $1,244 $1,900