Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,584

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ORC028 #06 Y:2026 Use solar heat to make electricty $50,661 $1,005,100
ORC028 #05 Y:2026 Turn off equipment during breaks, reduce operating time $93 $25
ORC028 #04 Y:2026 Turn off equipment during breaks, reduce operating time $651 -
ORC028 #03 Y:2026 Use computer programs to optimize hvac performance $819 -
ORC028 #02 Y:2026 Use computer programs to optimize hvac performance $1,229 -
ORC028 #01 Y:2026 Use computer programs to optimize hvac performance $1,405 -
UL2615 #04 Y:2026 Use solar heat to make electricty $33,051 $262,820
UL2615 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,910 $18,224
UL2615 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,206 $1,761
UL2615 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,149 $525
UF0652 #07 Y:2026 Replace the chlorination stage with an oxygen or ozone stage $3,650 $7,600
UF0652 #06 Y:2026 Use filter and drying oven to reduce sludge volume $12,547 $30,000
UF0652 #05 Y:2026 Use counter current rinsing to reduce waste water $323,609 $1,053,043
UF0652 #04 Y:2026 Provide proper maintenance of motor driven equipment $2,063 -
UF0652 #03 Y:2026 Use most efficient type of electric motors $13,103 $7,347
UF0652 #02 Y:2026 Use demand controller or load shedder $31,335 $15,438
UF0652 #01 Y:2026 Install anaerobic digester $43,759 $200,000
SD0699 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,660 $8,300
SD0699 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $22,763 $14,600
SD0699 #08 Y:2026 Use battery storage for demand control $104,154 $149,450