| Assessment Year | 2026 |
|---|---|
| Principal Product | Wood Cabinets |
| NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $10 M to 50M |
| # of Employees | 248 |
| Plant Area |
20,000
ft2
|
| Annual Production | 150,000
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,739 | 1,020,602 |
kWh
|
$0.12 |
| Electricity Demand | $175,603 | 4,682 |
kW-mo/yr
|
$37.51 |
| Electricity Fees | $10,481 | - |
|
- |
| TOTAL YEARLY COSTS | $310,823 | |||
| RECOMMENDED SAVINGS* | $308,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $202 | $847 |
$105
860
kWh
|
$97
-
kW-mo/yr
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,714 | - |
$2,714
22,213
kWh
|
- | |
| 03 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $1,371 | $2,200 |
$1,371
11,217
kWh
|
- | |
| 04 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $1,371 | $2,200 |
$1,371
11,217
kWh
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $2,884 | $5,195 |
$2,884
23,601
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $32,026 | $19,665 |
$14,376
117,639
kWh
|
$17,651
-
kW-mo/yr
|
|
| 07 | 2.9114: Use solar heat to make electricty | $127,345 | $250,841 |
$55,884
457,312
kWh
|
$71,461
-
kW-mo/yr
|
|
| 08 | 2.3141: Use battery storage for demand control | $104,154 | $149,450 |
$(-2,749.5)
(-22,500)
kWh
|
$106,904
-
kW-mo/yr
|
|
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,763 | $14,600 |
$11,851
96,980
kWh
|
$10,912
-
kW-mo/yr
|
|
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,660 | $8,300 |
$7,111
58,188
kWh
|
$6,549
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $308,490 | $453,298 |
$94,917
776,727
kWh
|
$213,573
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs