168,738
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1136 #01 Y:2026 | 01 | 2026 | Use flow control valves on equipment to optimize water use | $37,800 | $1,039 |
n/a
|
| ORC025 #03 Y:2026 | 03 | 2026 | Repair or replace steam traps | $6,452 | $1,432 |
n/a
|
| ORC025 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $2,575 | $4,361 |
n/a
|
| ORC025 #01 Y:2026 | 01 | 2026 | Reduce space conditioning during non-working hours | $4,484 | - |
n/a
|
| GT1007 #12 Y:2026 | 12 | 2026 | Optimize plant power factor | $859 | $4,814 |
n/a
|
| GT1007 #11 Y:2026 | 11 | 2026 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $95,454 | $517,500 |
n/a
|
| GT1007 #10 Y:2026 | 10 | 2026 | Turn off equipment during breaks, reduce operating time | $49 | $242 |
n/a
|
| GT1007 #09 Y:2026 | 09 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,648 | $7,708 |
n/a
|
| GT1007 #08 Y:2026 | 08 | 2026 | Use solar heat to make electricty | $97,140 | $373,452 |
n/a
|
| GT1007 #07 Y:2026 | 07 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $6,064 | $19,750 |
n/a
|
| GT1007 #06 Y:2026 | 06 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $646 | $1,561 |
n/a
|
| GT1007 #05 Y:2026 | 05 | 2026 | Eliminate or reduce compressed air usage | $737 | $600 |
n/a
|
| GT1007 #04 Y:2026 | 04 | 2026 | Conserve energy by efficient use of vending machines | $278 | $90 |
n/a
|
| GT1007 #03 Y:2026 | 03 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,732 | $400 |
n/a
|
| GT1007 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,431 | $1,850 |
n/a
|
| GT1007 #01 Y:2026 | 01 | 2026 | Apply for tax-free status for energy purchases | $14,393 | $400 |
n/a
|
| OK1168 #10 Y:2026 | 10 | 2026 | Pay utility bills on time | $33,366 | - |
n/a
|
| OK1168 #09 Y:2026 | 09 | 2026 | Install compressor air intakes in coolest locations | $41,364 | $3,030 |
n/a
|
| OK1168 #08 Y:2026 | 08 | 2026 | Recover waste heat from equipment | $13,393 | $400 |
n/a
|
| OK1168 #07 Y:2026 | 07 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $46,838 | $23,792 |
n/a
|