168,656
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1135 #05 Y:2026 | 05 | 2026 | Utilize higher efficiency lamps and/or ballasts | $32,518 | $10,472 |
n/a
|
| UD1135 #04 Y:2026 | 04 | 2026 | Reduce the pressure of compressed air to the minimum required | $11,563 | - |
n/a
|
| UD1135 #03 Y:2026 | 03 | 2026 | Eliminate or reduce compressed air usage | $5,715 | $3,500 |
n/a
|
| UD1135 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,254 | $1,000 |
n/a
|
| UD1135 #01 Y:2026 | 01 | 2026 | Turn off equipment when not in use | $19,731 | - |
n/a
|
| UF0647 #12 Y:2026 | 12 | 2026 | Re-arrange equipment layout to reduce labor costs | $5,628 | $1,368 |
n/a
|
| UF0647 #11 Y:2026 | 11 | 2026 | Optimize production lot sizes and inventories | $22,000 | $4,000 |
n/a
|
| UF0647 #10 Y:2026 | 10 | 2026 | Install sensors to detect defects | $50,000 | $85,000 |
n/a
|
| UF0647 #09 Y:2026 | 09 | 2026 | Automate finishing process | $242,080 | $200,000 |
n/a
|
| UF0647 #08 Y:2026 | 08 | 2026 | Substitute compressed air cooling with water or air cooling | $369 | $900 |
n/a
|
| UF0647 #07 Y:2026 | 07 | 2026 | Size electric motors for peak operating efficiency | $377 | - |
n/a
|
| UF0647 #06 Y:2026 | 06 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $442 | - |
n/a
|
| UF0647 #05 Y:2026 | 05 | 2026 | Minimize condenser cooling water temperature | $1,056 | $2,800 |
n/a
|
| UF0647 #04 Y:2026 | 04 | 2026 | Isolate hot or cold equipment | $7,455 | $28,000 |
n/a
|
| UF0647 #03 Y:2026 | 03 | 2026 | Utilize sensors controlling roof and wall openings | $8,168 | $4,000 |
n/a
|
| UF0647 #02 Y:2026 | 02 | 2026 | Use demand controller or load shedder | $19,310 | $12,418 |
n/a
|
| UF0647 #01 Y:2026 | 01 | 2026 | Use or replace with energy efficient substitutes | $75,479 | $250,000 |
n/a
|
| UD1134 #06 Y:2026 | 06 | 2026 | Reduce the pressure of compressed air to the minimum required | $485 | $513 |
n/a
|
| UD1134 #05 Y:2026 | 05 | 2026 | Use waste heat from hot flue gases to preheat | $14,966 | $24,590 |
n/a
|
| UD1134 #04 Y:2026 | 04 | 2026 | Install vinyl strip / high speed / air curtain doors | $3,493 | $3,900 |
n/a
|