ITAC Assessment: ORC025
ITAC logo
ITAC Assessment: ORC025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 1
Plant Area 86,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,885 334,716
kWh
Other Gas $109,532 4,148
MMBtu
Other Energy $37,850 892
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $183,269
RECOMMENDED SAVINGS* $13,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Other Energy Savings
01 2.7224: Reduce space conditioning during non-working hours $4,484 - - $3,636
-
MMBtu
$848
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,575 $4,361 $2,575
24,008
kWh
- -
03 2.2113: Repair or replace steam traps $6,452 $1,432 - $6,452
-
MMBtu
-
TOTAL RECOMMENDED $13,511 $5,793 $2,575
24,008
kWh
$10,088
-
MMBtu
$848
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs