Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STRUCTURAL FIBERGLASS
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $633,149 10,043,376
kWh
Natural Gas $265,444 115,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $125,830 $500,000 $229,328
3,779,895
kWh
$(-65,698.0)
-
MMBtu
$(-37,800.0)
02 2.8122: Use utility controlled power management $12,703 $25,000 $12,703
-
kWh
- -
03 2.4133: Use most efficient type of electric motors $3,278 $18,136 $3,278
52,169
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,936 $1,803 $3,856
61,254
kWh
- $80
05 2.7142: Utilize higher efficiency lamps and/or ballasts $15 $147 $47
1,172
kWh
- $(-32.0)
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,062 $2,400 $3,062
48,652
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,880 $100 $1,880
29,894
kWh
- -
TOTAL RECOMMENDED $150,704 $547,586 $254,154
3,973,036
kWh
$(-65,698.0)
-
MMBtu
$(-37,752.0)
TOTAL IMPLEMENTED $21,812 $45,186 $21,764
144,489
kWh
- $48
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs