170,607
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0400 #01 Y:2026 | 01 | 2026 | Lower temperature during the winter season and vice-versa | $1,243 | - |
n/a
|
| GT1012 #09 Y:2026 | 09 | 2026 | Use solar heat to make electricty | $349,269 | $2,074,730 |
n/a
|
| GT1012 #08 Y:2026 | 08 | 2026 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $282,619 | $966,000 |
n/a
|
| GT1012 #07 Y:2026 | 07 | 2026 | Install occupancy sensors | $5,710 | $12,894 |
n/a
|
| GT1012 #06 Y:2026 | 06 | 2026 | Utilize higher efficiency lamps and/or ballasts | $8,900 | $14,637 |
n/a
|
| GT1012 #05 Y:2026 | 05 | 2026 | Turn off equipment during breaks, reduce operating time | $1,511 | $2,210 |
n/a
|
| GT1012 #04 Y:2026 | 04 | 2026 | Eliminate or reduce compressed air usage | $10,234 | $14,450 |
n/a
|
| GT1012 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $7,194 | $9,500 |
n/a
|
| GT1012 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $86,480 | $1,850 |
n/a
|
| GT1012 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $9,373 | $100 |
n/a
|
| AS0619 #07 Y:2026 | 07 | 2026 | Install spectral reflectors / delamp | $345 | $563 |
n/a
|
| AS0619 #06 Y:2026 | 06 | 2026 | Reduce space conditioning during non-working hours | $1,638 | $94 |
n/a
|
| AS0619 #05 Y:2026 | 05 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $3,570 | $4,064 |
n/a
|
| AS0619 #04 Y:2026 | 04 | 2026 | Replace existing equipment with more suitable substitutes | $10,148 | $419 |
n/a
|
| AS0619 #03 Y:2026 | 03 | 2026 | Replace fossil fuel equipment with electrical equipment | $22,021 | $900 |
n/a
|
| AS0619 #02 Y:2026 | 02 | 2026 | Use solar heat to make electricty | $63,128 | $634,056 |
n/a
|
| AS0619 #01 Y:2026 | 01 | 2026 | Replace existing equipment with more suitable substitutes | $507,698 | $1,200,000 |
n/a
|
| UL2612 #05 Y:2026 | 05 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $1,850 | $1,313 |
n/a
|
| UL2612 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,267 | $1,575 |
n/a
|
| UL2612 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $19,848 | $7,349 |
n/a
|