ITAC Assessment: UL2612
ITAC logo
ITAC Assessment: UL2612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Braille Books and Educational Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 250,000
ft2
Annual Production 2,350,000
units
Production Hrs. Annual 2,106
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,971 2,620,026
kWh
Electricity Demand $155,208 8,078
kW-mo/yr
Electricity Fees $75,266 -
Natural Gas $28,417 3,077
MMBtu
Other Energy $2,635 1
MMBtu
TOTAL YEARLY COSTS $356,497
RECOMMENDED SAVINGS* $100,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $9,968 $10,400 - - $9,968
02 2.8114: Change rate schedules or other changes in utility service $66,453 - - - $66,453
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,848 $7,349 $4,933
136,262
kWh
$14,915
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,267 $1,575 $2,267
62,615
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,850 $1,313 $1,850
51,042
kWh
- -
TOTAL RECOMMENDED $100,386 $20,637 $9,050
249,919
kWh
$14,915
-
kW-mo/yr
$76,421
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs