Assessment Year | 1993 |
---|---|
Principal Product | SOAP |
NAICS |
n/a
|
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
n/a
|
Annual Production | 40,000,000
ton
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $294,619 | 5,073,564 |
kWh
|
$0.058 |
Natural Gas | $130,870 | 42,373 |
MMBtu
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,694 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $11,929 | $12,579 |
$11,929
-
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $1,895 | $1,250 |
$1,084
18,757
kWh
|
$811
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $151 | - |
$265
4,689
kWh
|
- | $(-114.0) | |
04 | 2.7135: Install occupancy sensors | $977 | $1,477 |
$977
16,706
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $3,546 | $6,061 |
$3,546
60,961
kWh
|
- | - | |
06 | 2.1213: Direct warmest air to combustion intake | $501 | $612 | - |
$501
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,748 | $25 |
$3,748
64,478
kWh
|
- | - | |
08 | 2.2437: Recover waste heat from equipment | $18,182 | $3,000 |
$(-30.0)
(-586)
kWh
|
$18,212
-
MMBtu
|
- | |
09 | 2.4322: Use or replace with energy efficient substitutes | $9,737 | $25,000 |
$9,737
167,644
kWh
|
- | - | |
10 | 2.2113: Repair or replace steam traps | $688 | $1,980 | - |
$688
-
MMBtu
|
- | |
11 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $310 | $520 |
$310
5,275
kWh
|
- | - | |
12 | 2.2437: Recover waste heat from equipment | $8,254 | $9,000 | - |
$8,254
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $59,918 | $61,504 |
$31,566
337,924
kWh
|
$28,466
-
MMBtu
|
$(-114.0) | ||
TOTAL IMPLEMENTED | $31,694 | $46,895 |
$30,309
316,529
kWh
|
$1,499
-
MMBtu
|
$(-114.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs