Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,584

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1012 #04 Y:2026 Eliminate or reduce compressed air usage $10,234 $14,450
GT1012 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $7,194 $9,500
GT1012 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $86,480 $1,850
GT1012 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $9,373 $100
AS0619 #07 Y:2026 Install spectral reflectors / delamp $345 $563
AS0619 #06 Y:2026 Reduce space conditioning during non-working hours $1,638 $94
AS0619 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,570 $4,064
AS0619 #04 Y:2026 Replace existing equipment with more suitable substitutes $10,148 $419
AS0619 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $22,021 $900
AS0619 #02 Y:2026 Use solar heat to make electricty $63,128 $634,056
AS0619 #01 Y:2026 Replace existing equipment with more suitable substitutes $507,698 $1,200,000
UL2612 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,850 $1,313
UL2612 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,267 $1,575
UL2612 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $19,848 $7,349
UL2612 #02 Y:2026 Change rate schedules or other changes in utility service $66,453 -
UL2612 #01 Y:2026 Optimize plant power factor $9,968 $10,400
UD1143 #05 Y:2026 Use solar heat to make electricty $33,170 $450,000
UD1143 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,641 $5,000
UD1143 #03 Y:2026 Conserve energy by efficient use of vending machines $1,698 $1,500
UD1143 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $2,326 $4,000