| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1151 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $129,213 | $1,350,000 |
n/a
|
| UD1151 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $15,023 | $27,000 |
n/a
|
| UD1151 #03 Y:2026 | 03 | 2026 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $6,394 | $17,000 |
n/a
|
| UD1151 #02 Y:2026 | 02 | 2026 | Reduce ventilation air | $12,198 | $22,000 |
n/a
|
| UD1151 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,394 | $12,000 |
n/a
|
| MI0478 #04 Y:2026 | 04 | 2026 | Use demand controller or load shedder | $4,519 | $18,392 |
n/a
|
| MI0478 #03 Y:2026 | 03 | 2026 | Turn off equipment when not in use | $14,074 | $2,600 |
n/a
|
| MI0478 #02 Y:2026 | 02 | 2026 | Lower temperature during the winter season and vice-versa | $27,548 | $480 |
n/a
|
| MI0478 #01 Y:2026 | 01 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $4,889 | - |
n/a
|
| UU0312 #05 Y:2026 | 05 | 2026 | Replace fossil fuel equipment with electrical equipment | $30,000 | $139,500 |
n/a
|
| UU0312 #04 Y:2026 | 04 | 2026 | Level zero – install control systems for existing equipment | $157,000 | $650,000 |
n/a
|
| UU0312 #03 Y:2026 | 03 | 2026 | Re-use or recycle hot or cold process exhaust air | $12,500 | $41,270 |
n/a
|
| UU0312 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $11,840 | $7,940 |
n/a
|
| UU0312 #01 Y:2026 | 01 | 2026 | Modify process to reduce material use/cost | $7,200 | $4,635 |
n/a
|
| UU0311 #06 Y:2026 | 06 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $11,150 | $93,000 |
n/a
|
| UU0311 #05 Y:2026 | 05 | 2026 | Insulate bare equipment | $1,230 | $2,350 |
n/a
|
| UU0311 #04 Y:2026 | 04 | 2026 | Reduce or eliminate waste | $3,600 | $4,640 |
n/a
|
| UU0311 #03 Y:2026 | 03 | 2026 | Use waste heat from hot flue gases to preheat | $13,900 | $41,300 |
n/a
|
| UU0311 #02 Y:2026 | 02 | 2026 | Use / purchase optimum sized compressor | $9,400 | $40,200 |
n/a
|
| UU0311 #01 Y:2026 | 01 | 2026 | Install system to collect scrap | $279,000 | $750,000 |
n/a
|