Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,626

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1003 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,175 $1,850
GT1003 #04 Y:2025 Reduce space conditioning during non-working hours $1,117 $600
GT1003 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $5,754 $2,400
GT1003 #02 Y:2025 Turn off equipment when not in use $19,447 $6,600
GT1003 #01 Y:2025 Use highest temperature for chilling or cold storage $1,244 $400
GT1002 #06 Y:2025 Use solar heat to make electricty $115,363 $829,891
GT1002 #05 Y:2025 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $366,345 $1,207,500
GT1002 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,772 $20,582
GT1002 #03 Y:2025 Insulate bare equipment $3,807 $4,806
GT1002 #02 Y:2025 Install occupancy sensors $1,240 $930
GT1002 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $40,202 $1,850
ORC023 #03 Y:2025 Reduce heat gain by window tinting $82 $197
ORC023 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $940 $1,661
ORC023 #01 Y:2025 Install occupancy sensors $140 $160
UF0644 #09 Y:2025 Re-arrange equipment layout to reduce labor costs $1,008 $1,360
UF0644 #08 Y:2025 Improve space comfort conditioning $47,532 $12,400
UF0644 #07 Y:2025 Modify storage space to avoid rental of a warehouse $54,000 -
UF0644 #06 Y:2025 Install an uninteruptable power supply $52,901 $24,080
UF0644 #05 Y:2025 Install equipment to move product $138,087 $384,000
UF0644 #04 Y:2025 Use fixtures to reduce machine changeout times $148,800 $220,000