ITAC Assessment: UU0309
ITAC logo
ITAC Assessment: UU0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Phosphate Fertilizer
NAICS 325312: Phosphatic Fertilizer Manufacturing
SIC 2874: Phosphatic Fertilizers
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 580,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,647,941 90,125,961
kWh
Electricity Demand $5,315,342 599,356
kW-mo/yr
Electricity Fees $1,826,269 -
Natural Gas $1,844,845 555,873
MMBtu
Waste Disposal Costs
Water Usage $1,498,968 499,656
Tgal
TOTAL YEARLY COSTS $13,133,365
RECOMMENDED SAVINGS* $1,156,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
01 4.426: Modify workload $300,000 $288,000 - $137,000
-
MMBtu
$13,000
-
Tgal
$150,000
02 2.2141: Operate distillation columns efficiently $186,000 $398,000 - $186,670
-
MMBtu
$(-670.0)
-
Tgal
-
03 2.2136: Install / repair insulation on steam lines $6,100 $4,670 - $6,100
-
MMBtu
- -
04 2.2134: Eliminate leaks in high pressure reducing stations $2,100 $1,650 - $2,100
-
MMBtu
- -
05 2.2127: Flash condensate to produce lower pressure steam $645,000 $402,000 - $595,000
-
MMBtu
$50,000
-
Tgal
-
06 2.4323: Use optimum size and capacity equipment $17,000 $39,000 $17,000
572,000
kWh
- - -
07 2.4239: Eliminate or reduce compressed air usage $390 $1,110 $390
13,170
kWh
- - -
TOTAL RECOMMENDED $1,156,590 $1,134,430 $17,390
585,170
kWh
$926,870
-
MMBtu
$62,330
-
Tgal
$150,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs