| Assessment Year | 2026 |
|---|---|
| Principal Product | Phosphate Fertilizer |
| NAICS | 325312: Phosphatic Fertilizer Manufacturing |
| SIC | 2874: Phosphatic Fertilizers |
| Sales Range | $100 M to 500M |
| # of Employees | 400 |
| Plant Area |
580,000
ft2
|
| Annual Production | 1,000,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,647,941 | 90,125,961 |
kWh
|
$0.029 | |
| Electricity Demand | $5,315,342 | 599,356 |
kW-mo/yr
|
$8.87 | |
| Electricity Fees | $1,826,269 | - |
|
- | |
| Natural Gas | $1,844,845 | 555,873 |
MMBtu
|
$3.32 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,498,968 | 499,656 |
Tgal
|
$3.00 | |
| TOTAL YEARLY COSTS | $13,133,365 | ||||
| RECOMMENDED SAVINGS* | $1,156,590 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.426: Modify workload | $300,000 | $288,000 | - |
$137,000
-
MMBtu
|
$13,000
-
Tgal
|
$150,000 | |
| 02 | 2.2141: Operate distillation columns efficiently | $186,000 | $398,000 | - |
$186,670
-
MMBtu
|
$(-670.0)
-
Tgal
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $6,100 | $4,670 | - |
$6,100
-
MMBtu
|
- | - | |
| 04 | 2.2134: Eliminate leaks in high pressure reducing stations | $2,100 | $1,650 | - |
$2,100
-
MMBtu
|
- | - | |
| 05 | 2.2127: Flash condensate to produce lower pressure steam | $645,000 | $402,000 | - |
$595,000
-
MMBtu
|
$50,000
-
Tgal
|
- | |
| 06 | 2.4323: Use optimum size and capacity equipment | $17,000 | $39,000 |
$17,000
572,000
kWh
|
- | - | - | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $390 | $1,110 |
$390
13,170
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $1,156,590 | $1,134,430 |
$17,390
585,170
kWh
|
$926,870
-
MMBtu
|
$62,330
-
Tgal
|
$150,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs