Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,378

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0085 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,961 -
MU0085 #03 Y:2026 Install compressor air intakes in coolest locations $1,488 $455
MU0085 #02 Y:2026 Insulate glazing, walls, ceilings, and roofs $10,748 $73,099
MU0085 #01 Y:2026 Use solar heat to make electricty $74,639 $1,091,000
UL2602 #07 Y:2026 Recover waste heat from equipment $22,369 $25,000
UL2602 #06 Y:2026 Use solar heat to make electricty $45,457 $471,029
UL2602 #05 Y:2026 Recover waste heat from equipment $26,375 $80,000
UL2602 #04 Y:2026 Install / repair insulation on steam lines $5,603 $2,318
UL2602 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,036 $16,250
UL2602 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $6,663 -
UL2602 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $6,840 $1,337
MZ1021 #04 Y:2026 Replace existing chiller with high efficiency model $1,976 $17,486
MZ1021 #03 Y:2026 Lower temperature during the winter season and vice-versa $1,199 $240
MZ1021 #02 Y:2026 Install occupancy sensors $188 $600
MZ1021 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,526 $3,875
MS0466 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $19,101 $93,000
MS0466 #05 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $42,861 $712
MS0466 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,210 $2,244
MS0466 #03 Y:2026 Combine utility meters $300 -
MS0466 #02 Y:2026 Change rate schedules or other changes in utility service $44,517 -