Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,378

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2517 #05 Y:2025 Install compressor air intakes in coolest locations $613 $950
UC2517 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,387 -
UC2517 #03 Y:2025 Use or replace with energy efficient substitutes $4,211 $30,300
UC2517 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,638 $340
UC2517 #01 Y:2025 Change rate schedules or other changes in utility service $17,808 -
OK1164 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $580 $1,847
OK1164 #03 Y:2025 Clean and maintain refrigerant condensers and towers $566 $780
OK1164 #02 Y:2025 Replace existing hvac unit with high efficiency model $1,105 $3,355
OK1164 #01 Y:2025 Use solar heat to make electricty $201,784 $2,044,800
MS0462 #05 Y:2025 Clean or color roof to reduce solar load $4,587 $19,764
MS0462 #04 Y:2025 Use solar heat to make electricty $58,484 $501,281
MS0462 #03 Y:2025 Install occupancy sensors $868 $1,889
MS0462 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,048 $1,973
MS0462 #01 Y:2025 Use most efficient type of electric motors $533 $3,825
UW2513 #06 Y:2025 Insulate bare equipment $1,107 $300
UW2513 #05 Y:2025 Replace boiler $96,673 $218,500
UW2513 #04 Y:2025 Utilize controls to operate equipment only when needed $31,214 $2,500
UW2513 #03 Y:2025 Minimize water usage $1,478 $4,580
UW2513 #02 Y:2025 Install occupancy sensors $3,139 $32,600
UW2513 #01 Y:2025 Moderate cooling tower outlet temperature $30,745 $300