| Assessment Year | 2026 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
62,500
ft2
|
| Annual Production | 300,000
ton
|
| Production Hrs. Annual | 2,640
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $496,406 | 8,279,648 |
kWh
|
$0.060 |
| Electricity Demand | $614,562 | 58,906 |
kW-mo/yr
|
$10.43 |
| Natural Gas | $539,000 | 146,836 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | $1,649,968 | |||
| RECOMMENDED SAVINGS* | $99,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,125 | $2,840 |
$13,975
232,843
kWh
|
$3,150
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,372 | $2,598 |
$14,372
239,527
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $37,996 | $12,500 |
$21,225
353,760
kWh
|
$16,771
-
kW-mo/yr
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,137 | $11,000 |
$11,246
187,440
kWh
|
$8,891
-
kW-mo/yr
|
|
| 05 | 2.4112: Install soft-start to eliminate nuisance trips | $1,627 | $2,000 | - |
$1,627
-
kW-mo/yr
|
|
| 06 | 2.4226: Use / purchase optimum sized compressor | $7,089 | $15,050 |
$3,960
66,000
kWh
|
$3,129
-
kW-mo/yr
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,594 | $8,000 |
$1,406
23,436
kWh
|
$188
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $99,940 | $53,988 |
$66,184
1,103,006
kWh
|
$33,756
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs