170,596
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0700 #04 Y:2026 | 04 | 2026 | Install direct acting units in place of compressed air pressure system in safety system | $2,072 | $2,000 |
n/a
|
| SD0700 #03 Y:2026 | 03 | 2026 | Install direct acting units in place of compressed air pressure system in safety system | $922 | $1,000 |
n/a
|
| SD0700 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,294 | - |
n/a
|
| SD0700 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $187 | $762 |
n/a
|
| MI0478 #04 Y:2026 | 04 | 2026 | Use demand controller or load shedder | $4,519 | $18,392 |
n/a
|
| MI0478 #03 Y:2026 | 03 | 2026 | Turn off equipment when not in use | $14,074 | $2,600 |
n/a
|
| MI0478 #02 Y:2026 | 02 | 2026 | Lower temperature during the winter season and vice-versa | $27,548 | $480 |
n/a
|
| MI0478 #01 Y:2026 | 01 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $4,889 | - |
n/a
|
| MI0477 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $4,509 | $19,466 |
n/a
|
| MI0477 #05 Y:2026 | 05 | 2026 | Change rate schedules or other changes in utility service | $96 | $104 |
n/a
|
| MI0477 #04 Y:2026 | 04 | 2026 | Close holes and openings in building such as broken windows | $657 | $396 |
n/a
|
| MI0477 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $23,136 | $1,886 |
n/a
|
| MI0477 #02 Y:2026 | 02 | 2026 | Eliminate or reduce compressed air usage | $3,579 | $185 |
n/a
|
| MI0477 #01 Y:2026 | 01 | 2026 | Use solar heat to make electricty | $41,053 | $1,380 |
n/a
|
| WV0703 #06 Y:2026 | 06 | 2026 | Utilize higher efficiency lamps and/or ballasts | $520 | $1,456 |
n/a
|
| WV0703 #05 Y:2026 | 05 | 2026 | Use waste heat from hot flue gases to preheat | $1,009 | $3,255 |
n/a
|
| WV0703 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,104 | $1,600 |
n/a
|
| WV0703 #03 Y:2026 | 03 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,222 | $2,159 |
n/a
|
| WV0703 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $2,406 | $972 |
n/a
|
| WV0703 #01 Y:2026 | 01 | 2026 | Analyze flue gas for proper air/fuel ratio | $5,151 | $3,159 |
n/a
|