Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,596

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM39 #07 Y:2026 Keep equipment clean $2,082 -
MUCM39 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $63 $65
MUCM39 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $52 -
MUCM39 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $83 $599
MUCM39 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,463 $6,728
MUCM39 #02 Y:2026 Use optimum temperature $5,872 -
MUCM39 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $23,146 $32,280
LS2607 #04 Y:2026 Eliminate old stock and modify inventory control $18,250 $25,000
LS2607 #03 Y:2026 Install sub-metering equipment $8,629 $4,500
LS2607 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $248 $50
LS2607 #01 Y:2026 Increase amount of waste recovered for resale $32,800 -
NL0131 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $113 $35
NL0131 #05 Y:2026 Turn off equipment when not in use $118 $35
NL0131 #04 Y:2026 Close holes and openings in building such as broken windows $274 $172
NL0131 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $818 $335
NL0131 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,787 $3,355
NL0131 #01 Y:2026 Size electric motors for peak operating efficiency $54,053 $4,639
MU0090 #11 Y:2026 Insulate glazing, walls, ceilings, and roofs $155 $161
MU0090 #10 Y:2026 Install timers and/or thermostats $21 $22
MU0090 #09 Y:2026 Use radiant heater for spot heating $712 $3,958