ITAC Assessment: MUCM39
ITAC logo
ITAC Assessment: MUCM39
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product K-12 School
NAICS 611110: Elementary and Secondary Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 125
Plant Area 150,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,613 867,541
kWh
Electricity Demand $25,493 2,681
kW-mo/yr
Electricity Fees $6,027 -
Natural Gas $47,855 7,957
MMBtu
Other Energy $7,726 1
MMBtu
Waste Disposal Costs
Water Usage $20,715 1,129
Tgal
TOTAL YEARLY COSTS $183,429
RECOMMENDED SAVINGS* $43,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,146 $32,280 $17,597
202,268
kWh
$5,549
-
kW-mo/yr
-
02 2.2211: Use optimum temperature $5,872 - - - $5,872
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,325 $8,728 $4,632
53,236
kWh
$693
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $326 $583 $248
2,856
kWh
$78
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $90 - $56
643
kWh
$34
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $63 $65 $37
430
kWh
$26
-
kW-mo/yr
-
07 2.6125: Keep equipment clean $2,082 - $1,715
19,707
kWh
$368
-
kW-mo/yr
-
08 2.7111: Reduce illumination to minimum necessary levels $213 - $162
1,864
kWh
$50
-
kW-mo/yr
-
09 2.7134: Use photocell controls $1,523 $3,292 $1,158
13,305
kWh
$365
-
kW-mo/yr
-
10 2.7134: Use photocell controls $941 - $817
9,391
kWh
$124
-
kW-mo/yr
-
11 2.7135: Install occupancy sensors $518 $1,044 $394
4,526
kWh
$125
-
kW-mo/yr
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $336 $416 $293
3,362
kWh
$44
-
kW-mo/yr
-
13 2.7241: Install outside air damper / economizer on hvac unit $96 - $66
757
kWh
$30
-
kW-mo/yr
-
14 2.7261: Install timers and/or thermostats $2,790 $358 $2,714
31,200
kWh
$76
-
kW-mo/yr
-
15 2.7261: Install timers and/or thermostats $537 $260 $281
3,226
kWh
$257
-
kW-mo/yr
-
16 2.7444: Close holes and openings in building such as broken windows $68 $242 - - $68
-
MMBtu
TOTAL RECOMMENDED $43,928 $47,268 $30,169
346,770
kWh
$7,819
-
kW-mo/yr
$5,940
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs