| Assessment Year | 2026 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 3 |
| Plant Area |
49,935
ft2
|
| Annual Production | 474,500
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $114,700 | 1,674,450 |
kWh
|
$0.069 | |
| Electricity Demand | $49,232 | 3,077 |
kW-mo/yr
|
$16.00 | |
| Natural Gas | $15,555 | 5,717 |
MMBtu
|
$2.72 | |
| Fuel Oil #2 | $5,073 | 207 |
MMBtu
|
$24.46 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,367 | 1,878 |
Tgal
|
$1.79 | |
| TOTAL YEARLY COSTS | $187,927 | ||||
| RECOMMENDED SAVINGS* | $57,164 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4131: Size electric motors for peak operating efficiency | $54,053 | $4,639 |
$809
11,725
kWh
|
- |
$305
-
MMBtu
|
$52,939 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,787 | $3,355 |
$394
5,706
kWh
|
$1,394
-
kW-mo/yr
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $818 | $335 |
$622
9,009
kWh
|
$197
-
kW-mo/yr
|
- | - | |
| 04 | 2.7444: Close holes and openings in building such as broken windows | $274 | $172 |
$274
3,974
kWh
|
- | - | - | |
| 05 | 2.6218: Turn off equipment when not in use | $118 | $35 |
$93
1,340
kWh
|
$26
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $113 | $35 |
$113
1,633
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $57,164 | $8,571 |
$2,304
33,387
kWh
|
$1,616
-
kW-mo/yr
|
$305
-
MMBtu
|
$52,939 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs