*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 70,000
ft2
Annual Production 5,840,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,818 7,876,800
kWh
Electricity Demand $216,531 18,155
kW-mo/yr
Electricity Fees $5,140 -
Natural Gas $2,550 186
MMBtu
TOTAL YEARLY COSTS $423,039
RECOMMENDED SAVINGS* $49,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.5122: Replace high resistance ducts, pipes, and fittings $23,778 $10,000 $9,204
359,525
kWh
$14,574
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $3,505 $30,000 $2,568
100,300
kWh
$937
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $20,241 $210,000 $4,485
175,200
kWh
$15,756
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $1,499 $12,000 - - $1,499
TOTAL RECOMMENDED $49,023 $262,000 $16,257
635,025
kWh
$31,267
-
kW-mo/yr
$1,499
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs