Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0982 #13 Y:2017 Install equipment (eg compactor) to reduce disposal costs $13,372 $10,000
UD0982 #12 Y:2017 Add area lighting switches $675 $500
UD0982 #11 Y:2017 Install occupancy sensors $5,167 $1,500
UD0982 #10 Y:2017 Make a practice of turning off lights when not needed $5,443 -
UD0982 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $46,311 $113,386
UD0982 #08 Y:2017 Cover open tanks $700 $460
UD0982 #07 Y:2017 Cover open tanks $268 -
UD0982 #06 Y:2017 Eliminate or reduce compressed air usage $2,208 $3,500
UD0982 #05 Y:2017 Install compressor air intakes in coolest locations $6,501 $8,000
UD0982 #04 Y:2017 Eliminate or reduce compressed air usage $9,415 -
UD0982 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $12,010 $500
UD0982 #02 Y:2017 Reduce ventilation air $9,420 $3,000
UD0982 #01 Y:2017 Utilize energy-efficient belts and other improved mechanisms $21,886 -
SU0455 #06 Y:2017 Replace boiler $14,840 $64,975
SU0455 #05 Y:2017 Install occupancy sensors $199 $491
SU0455 #04 Y:2017 Conserve energy by efficient use of vending machines $284 $666
SU0455 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $461 $1,045
SU0455 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $31,032 $51,111
SU0455 #01 Y:2017 Use or replace with energy efficient substitutes $8,432 -
NL0015 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $3,190 $4,500