ITAC Assessment: NL0019
ITAC logo
ITAC Assessment: NL0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Steel Casting Parts
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,022 9,000,000
kWh
Electricity Demand $393,257 38,151
kW-mo/yr
Electricity Fees $21,914 -
Natural Gas $153,703 25,475
MMBtu
Waste Disposal Costs
Water Usage $8,108 4,245
Tgal
Water Disposal $14,953 3,998
Tgal
TOTAL YEARLY COSTS $870,957
RECOMMENDED SAVINGS* $44,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,000 $23,000 $14,835
485,000
kWh
$8,165
-
kW-mo/yr
- - - -
02 2.2628: Utilize a less expensive cooling method $9,412 $32,000 $(-1,880.0)
(-60,662)
kWh
$(-4,133.0)
-
kW-mo/yr
$5,214
-
Tgal
$10,211
-
Tgal
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,580 - $8,000
259,000
kWh
- - - $(-420.0) -
04 3.1161: Eliminate/reduce an operation $5,000 $6,500 - - - - - $5,000
TOTAL RECOMMENDED $44,992 $61,500 $20,955
683,338
kWh
$4,032
-
kW-mo/yr
$5,214
-
Tgal
$10,211
-
Tgal
$(-420.0) $5,000
TOTAL IMPLEMENTED $30,580 $23,000 $22,835
744,000
kWh
$8,165
-
kW-mo/yr
- - $(-420.0) -