ITAC Assessment: NL0020
ITAC logo
ITAC Assessment: NL0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Grain: Corn, Soybeans, Wheat
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 500,000
ft2
Annual Production 110,000,000
bushels
Production Hrs. Annual 2,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $439,007 4,903,593
kWh
Electricity Demand $152,263 19,796
kW-mo/yr
Natural Gas $13,530 2,001
MMBtu
Waste Disposal Costs
Water Usage $3,695 1,104,018
Tgal
Water Disposal $4,040 1,104
Tgal
TOTAL YEARLY COSTS $612,534
RECOMMENDED SAVINGS* $24,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,414 $29,401 $19,094
211,640
kWh
$3,320
-
kW-mo/yr
-
02 2.7229: Air condition only space necessary $1,869 $56 - - $1,869
-
MMBtu
03 2.4133: Use most efficient type of electric motors $543 $2,476 $404
4,481
kWh
$139
-
kW-mo/yr
-
04 2.7226: Use computer programs to optimize hvac performance $81 $200 - - $81
-
MMBtu
TOTAL RECOMMENDED $24,906 $32,133 $19,498
216,121
kWh
$3,459
-
kW-mo/yr
$1,950
-
MMBtu
TOTAL IMPLEMENTED $24,364 $29,657 $19,094
211,640
kWh
$3,320
-
kW-mo/yr
$1,950
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs