Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153,093

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0055 #07 Y:2021 Utilize a less expensive cooling method $2,036 $1,070
NL0055 #06 Y:2021 Turn off equipment when not in use $1,895 $64
NL0055 #05 Y:2021 Improve handling practices $3,600 $1,600
NL0055 #04 Y:2021 Use precipitating agents in waste water treatment that produce the least quantity of waste $3,858 $146
NL0055 #03 Y:2021 Use insulation in furnaces to facilitate heating / cooling $6,244 $19,200
NL0055 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $35,975 $4,500
NL0055 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $60,616 $121,800
SD0607 #08 Y:2021 Use most efficient type of electric motors $487 $540
SD0607 #07 Y:2021 Install compressor air intakes in coolest locations $481 $706
SD0607 #06 Y:2021 Reduce illumination to minimum necessary levels $794 $760
SD0607 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,289 $2,741
SD0607 #04 Y:2021 Utilize energy-efficient belts and other improved mechanisms $2,753 $568
SD0607 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $13,885 $2,100
SD0607 #02 Y:2021 Replace existing hvac unit with high efficiency model $17,809 $38,800
SD0607 #01 Y:2021 Recharge batteries on during off-peak demand periods $26,888 $500
MZ0309 #07 Y:2021 Optimize plant power factor $354,701 $442,138
MZ0309 #06 Y:2021 Use fossil fuel powered generator during peak demand periods $353,125 $770,000
MZ0309 #05 Y:2021 Install compressor air intakes in coolest locations $4,736 $4,920
MZ0309 #04 Y:2021 Utilize energy-efficient belts and other improved mechanisms $11,649 $4,200
MZ0309 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $41,876 $42,513