ITAC Assessment: SD0607
ITAC logo
ITAC Assessment: SD0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Flour
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 41
Plant Area 80,000
ft2
Annual Production 214,800
ton
Production Hrs. Annual 8,592
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,375,636 13,576,357
kWh
Electricity Demand $696,959 28,691
kW-mo/yr
Electricity Fees $181,724 -
Waste Disposal Costs
Water Usage $3,619 891
Tgal
TOTAL YEARLY COSTS $2,257,938
RECOMMENDED SAVINGS* $66,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $26,888 $500 $7,604
423,561
kWh
$19,284
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $17,809 $38,800 $14,230
140,491
kWh
$3,579
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,885 $2,100 $11,893
117,404
kWh
$1,992
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,753 $568 $2,061
20,435
kWh
$692
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,289 $2,741 $2,387
23,573
kWh
$799
-
kW-mo/yr
$103
06 2.7111: Reduce illumination to minimum necessary levels $794 $760 $595
5,877
kWh
$199
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $481 $706 $413
4,077
kWh
$68
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $487 $540 $365
3,599
kWh
$122
-
kW-mo/yr
-
TOTAL RECOMMENDED $66,386 $46,715 $39,548
739,017
kWh
$26,735
-
kW-mo/yr
$103
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs