ITAC Assessment: UU0027
ITAC logo
ITAC Assessment: UU0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Irrgation Products
NAICS
n/a
SIC 3342:
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 340,800
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,443 3,288,240
kWh
Electricity Demand $76,020 747
kW-mo/yr
Electricity Fees $28,577 -
Natural Gas $66,005 11,655
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,374

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,326 $9,484 $4,309
134,709
kWh
$2,017
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,774 $180 $1,002
33,262
kWh
$772
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $631 $442 $364
11,644
kWh
$267
-
kW-mo/yr
04 2.3212: Optimize plant power factor $6,600 $4,500 - $6,600
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,770 $12,000 $9,380
293,268
kWh
$4,390
-
kW-mo/yr
TOTAL RECOMMENDED $29,101 $26,606 $15,055
472,883
kWh
$14,046
-
kW-mo/yr
TOTAL IMPLEMENTED $8,374 $4,680 $1,002
33,262
kWh
$7,372
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs