ITAC Assessment: ME0176
ITAC logo
ITAC Assessment: ME0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Newspaper
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 291
Plant Area 60,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 4,800
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,532 1,476,846
kWh
Electricity Demand $37,914 4,590
kW-mo/yr
Electricity Fees $1,742 -
Natural Gas $15,139 2,269
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,031 $21,000 $6,387
89,683
kWh
$1,644
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $2,412 - - - - $2,412
03 2.2437: Recover waste heat from equipment $1,404 $580 - - $1,404
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $504 $400 $504
7,327
kWh
- - -
TOTAL RECOMMENDED $12,351 $21,980 $6,891
97,010
kWh
$1,644
-
kW-mo/yr
$1,404
-
MMBtu
$2,412
TOTAL IMPLEMENTED $3,816 $580 - - $1,404
-
MMBtu
$2,412
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs