Assessment Year | 2007 |
---|---|
Principal Product | corrugated cartons |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
117,000
ft2
|
Annual Production | 500,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $287,641 | 4,336,800 |
kWh
|
$0.066 |
Electricity Demand | $167,194 | 12,991 |
kW-mo/yr
|
$12.87 |
Fuel Oil #2 | $360,906 | 37,286 |
MMBtu
|
$9.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $247,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $205,544 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $143,645 | $50,000 | - | - |
$143,645
-
MMBtu
|
|
02 | 2.5122: Replace high resistance ducts, pipes, and fittings | $61,899 | $515,000 |
$24,579
372,403
kWh
|
$3,072
-
kW-mo/yr
|
$34,248
-
MMBtu
|
|
03 | 2.4226: Use / purchase optimum sized compressor | $20,393 | $80,000 |
$20,393
308,978
kWh
|
- | - | |
04 | 2.4323: Use optimum size and capacity equipment | $8,675 | $700 |
$8,675
131,437
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,335 | $200 |
$3,947
59,804
kWh
|
$1,388
-
kW-mo/yr
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,016 | $2,000 | - |
$5,016
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,483 | $1,000 |
$1,741
26,383
kWh
|
$742
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $247,446 | $648,900 |
$59,335
899,005
kWh
|
$10,218
-
kW-mo/yr
|
$177,893
-
MMBtu
|
||
TOTAL IMPLEMENTED | $205,544 | $565,000 |
$24,579
372,403
kWh
|
$3,072
-
kW-mo/yr
|
$177,893
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs