ITAC Assessment: NL0055
ITAC logo
ITAC Assessment: NL0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Appetizers
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 131,778
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 6,624
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,322,399 25,836,515
kWh
Electricity Demand $592,672 49,811
kW-mo/yr
Electricity Fees $7,674 -
Natural Gas $375,044 240,322
MMBtu
Waste Disposal Costs
Water Usage $79,822 85,646
Tgal
Water Disposal $394,570 78,288
Tgal
TOTAL YEARLY COSTS $2,772,181
RECOMMENDED SAVINGS* $114,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $60,616 $121,800 - - $37,936 - $22,680
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $35,975 $4,500 $37,171
728,840
kWh
- $(-896.0) $(-300.0) -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $6,244 $19,200 - $6,244
-
MMBtu
- - -
04 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $3,858 $146 - $(-342.0)
-
MMBtu
- $4,200 -
05 3.7121: Improve handling practices $3,600 $1,600 - - - - $3,600
06 2.6218: Turn off equipment when not in use $1,895 $64 $1,895
37,893
kWh
- - - -
07 2.2628: Utilize a less expensive cooling method $2,036 $1,070 - - $2,036 - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $252 $1,000 $252
4,943
kWh
- - - -
TOTAL RECOMMENDED $114,476 $149,380 $39,318
771,676
kWh
$5,902
-
MMBtu
$39,076 $3,900 $26,280
TOTAL IMPLEMENTED $104,301 $129,046 $37,423
733,783
kWh
$(-342.0)
-
MMBtu
$37,040 $3,900 $26,280
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs