ITAC Assessment: UM0068
ITAC logo
ITAC Assessment: UM0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Seamless Tubing
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 109,000
ft2
Annual Production 960
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,248 3,361,665
kWh
Electricity Demand $112,293 6,274
kW-mo/yr
Electricity Fees $5,085 -
Natural Gas $114,481 26,114
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $994 $1,630 $511
17,292
kWh
$483
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,473 $18,075 $7,132
128,077
kWh
$3,341
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $5,202 $5,124 - - $5,202 - -
04 2.4314: Use synthetic lubricant $659 $220 $372
12,603
kWh
$287
-
kW-mo/yr
- - -
05 2.7231: Use radiant heater for spot heating $13,757 $55,000 - - - $13,757
-
MMBtu
-
06 3.4114: Replace city water with recycled water via cooling tower $24,612 $3,100 - - - - $24,612
-
Tgal
TOTAL RECOMMENDED $55,697 $83,149 $8,015
157,972
kWh
$4,111
-
kW-mo/yr
$5,202 $13,757
-
MMBtu
$24,612
-
Tgal
TOTAL IMPLEMENTED $41,281 $27,929 $7,643
145,369
kWh
$3,824
-
kW-mo/yr
$5,202 - $24,612
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs