ITAC Assessment: UD0665
ITAC logo
ITAC Assessment: UD0665
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 204
Plant Area 67,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,823 8,134,333
kWh
Electricity Demand $186,069 15,060
kW-mo/yr
Natural Gas $257,124 354,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $488,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 4.453: Reschedule breaks to allow for continuous production $380,000 $38,587 - - - $380,000
02 2.2414: Use waste heat from hot flue gases to preheat $74,995 $40,000 - - $74,995
-
MMBtu
-
03 2.2511: Insulate bare equipment $14,021 $1,545 $5,980
227,378
kWh
$4,794
-
kW-mo/yr
$3,247
-
MMBtu
-
04 2.2514: Cover open tanks $7,200 $12,000 - - $7,200
-
MMBtu
-
05 2.4226: Use / purchase optimum sized compressor $4,325 - $4,325
164,400
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,561 $8,112 $1,947
74,880
kWh
$1,614
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,363 $6,762 $1,292
49,680
kWh
$1,071
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,130 $1,000 $665
25,200
kWh
$465
-
kW-mo/yr
- -
09 2.7122: Disconnect ballasts $790 $45 $432
16,632
kWh
$358
-
kW-mo/yr
- -
10 2.2514: Cover open tanks $256 $400 - - $256
-
MMBtu
-
TOTAL RECOMMENDED $488,641 $108,451 $14,641
558,170
kWh
$8,302
-
kW-mo/yr
$85,698
-
MMBtu
$380,000
TOTAL IMPLEMENTED $8,932 $8,557 $6,704
255,912
kWh
$1,972
-
kW-mo/yr
$256
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs