ITAC Assessment: LS2103
ITAC logo
ITAC Assessment: LS2103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Conveyor Plastic Belt
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 263
Plant Area 162,143
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,181,491 32,942,136
kWh
TOTAL YEARLY COSTS $2,181,491
RECOMMENDED SAVINGS* $285,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $285,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2625: Chill water to the highest temperature possible $35,907 $250 $35,907
542,229
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,807 $428 $2,807
42,386
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,440 $900 $5,440
82,147
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $31,154 $39,829 $31,154
470,455
kWh
05 2.2622: Replace existing chiller with high efficiency model $209,892 $1,023,215 $209,892
3,169,524
kWh
TOTAL RECOMMENDED $285,200 $1,064,622 $285,200
4,306,741
kWh
TOTAL IMPLEMENTED $285,200 $1,064,622 $285,200
4,306,741
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs