Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,200

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0060 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,572 $5,099
NT0060 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,093 $3,695
NT0060 #02 Y:2026 Optimize plant power factor $6,593 $6,682
NT0060 #01 Y:2026 Use / purchase optimum sized compressor $28,171 $27,132
IC0344 #10 Y:2026 Keep doors and windows shut when not on use $16 -
IC0344 #09 Y:2026 Use or replace with energy efficient substitutes $13,246 $50,000
IC0344 #08 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600
IC0344 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $319 $548
IC0344 #06 Y:2026 Install / repair insulation on steam lines $954 $1,353
IC0344 #05 Y:2026 Insulate feedwater tank $551 $660
IC0344 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,531 $1,604
IC0344 #03 Y:2026 Upgrade controls on compressors $12,669 $3,021
IC0344 #02 Y:2026 Use battery storage for demand control $23,871 $30,729
IC0344 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $348 $50
UD1130 #09 Y:2026 Install occupancy sensors $728 $393
UD1130 #08 Y:2026 Disconnect ballasts $901 $300
UD1130 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $996 $759
UD1130 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $6,540 $5,408
UD1130 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,951 $953
UD1130 #04 Y:2026 Install motor voltage controller on lightly loaded motors $10,947 $3,607