Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,458

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM35 #02 Y:2026 Reduce space conditioning during non-working hours $5,389 -
MUCM35 #01 Y:2026 Replace existing hvac unit with high efficiency model $61,742 $392,321
UL2605 #06 Y:2026 Use outside cold water source as a supply of cooling water $236,979 $474,400
UL2605 #05 Y:2026 Use solar heat to make electricty $26,708 $193,418
UL2605 #04 Y:2026 Increase amount of condensate returned $28,057 $40,600
UL2605 #03 Y:2026 Install / repair insulation on steam lines $5,070 $3,340
UL2605 #02 Y:2026 Recover waste heat from equipment $5,474 $13,000
UL2605 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,992 $1,155
AS0613 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $72 $154
AS0613 #06 Y:2026 Install occupancy sensors $314 $220
AS0613 #05 Y:2026 Insulate bare equipment $1,723 $808
AS0613 #04 Y:2026 Re-arrange equipment layout to reduce labor costs $2,160 $680
AS0613 #03 Y:2026 Use solar heat to make electricty $4,425 $27,975
AS0613 #02 Y:2026 Replace boiler $4,953 $7,100
AS0613 #01 Y:2026 Change rate schedules or other changes in utility service $22,713 $13,550
UC2603 #11 Y:2026 Develop standard procedures to improve internal yields $20,020 $3,100
UC2603 #10 Y:2026 Modify startup/shutdown times $10,400 $3,600
UC2603 #09 Y:2026 Eliminate or reduce compressed air usage $3,406 $2,250
UC2603 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,596 $16,800
UC2603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,471 $10,650