| Assessment Year | 2026 |
|---|---|
| Principal Product | beer and ale |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $1 M to 5M |
| # of Employees | 155 |
| Plant Area |
24,400
ft2
|
| Annual Production | 5,000
units
|
| Production Hrs. Annual | 2,064
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $74,456 | 659,440 |
kWh
|
$0.11 | |
| Electricity Demand | $7,191 | 548 |
kW-mo/yr
|
$13.12 | |
| Electricity Fees | $10,222 | - |
|
- | |
| Natural Gas | $48,573 | 4,307 |
MMBtu
|
$11.28 | |
| LPG | $705 | 29 |
MMBtu
|
$24.31 | |
| Waste Disposal Costs | |||||
| Water Usage | $30,505 | 1,978 |
Tgal
|
$15.42 | |
| Water Disposal | $35,197 | 1,694 |
Tgal
|
$20.78 | |
| TOTAL YEARLY COSTS | $206,849 | ||||
| RECOMMENDED SAVINGS* | $36,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $22,713 | $13,550 | - | - | - | $22,713 | - | |
| 02 | 2.1224: Replace boiler | $4,953 | $7,100 |
$4,953
43,680
kWh
|
- | - | - | - | |
| 03 | 2.9114: Use solar heat to make electricty | $4,425 | $27,975 |
$4,855
42,814
kWh
|
- | - | - | $(-430.0) | |
| 04 | 4.513: Re-arrange equipment layout to reduce labor costs | $2,160 | $680 | - | - | $2,160 | - | - | |
| 05 | 2.2511: Insulate bare equipment | $1,723 | $808 | - |
$1,723
-
MMBtu
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $314 | $220 |
$314
2,766
kWh
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $72 | $154 |
$64
560
kWh
|
- | - | - | $8 | |
| TOTAL RECOMMENDED | $36,360 | $50,487 |
$10,186
89,820
kWh
|
$1,723
-
MMBtu
|
$2,160 | $22,713 | $(-422.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs