ITAC Assessment: AS0613
ITAC logo
ITAC Assessment: AS0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product beer and ale
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 155
Plant Area 24,400
ft2
Annual Production 5,000
units
Production Hrs. Annual 2,064
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,456 659,440
kWh
Electricity Demand $7,191 548
kW-mo/yr
Electricity Fees $10,222 -
Natural Gas $48,573 4,307
MMBtu
LPG $705 29
MMBtu
Waste Disposal Costs
Water Usage $30,505 1,978
Tgal
Water Disposal $35,197 1,694
Tgal
TOTAL YEARLY COSTS $206,849
RECOMMENDED SAVINGS* $36,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $22,713 $13,550 - - - $22,713 -
02 2.1224: Replace boiler $4,953 $7,100 $4,953
43,680
kWh
- - - -
03 2.9114: Use solar heat to make electricty $4,425 $27,975 $4,855
42,814
kWh
- - - $(-430.0)
04 4.513: Re-arrange equipment layout to reduce labor costs $2,160 $680 - - $2,160 - -
05 2.2511: Insulate bare equipment $1,723 $808 - $1,723
-
MMBtu
- - -
06 2.7135: Install occupancy sensors $314 $220 $314
2,766
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $72 $154 $64
560
kWh
- - - $8
TOTAL RECOMMENDED $36,360 $50,487 $10,186
89,820
kWh
$1,723
-
MMBtu
$2,160 $22,713 $(-422.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs