ITAC Assessment: UC2603
ITAC logo
ITAC Assessment: UC2603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product custom molded plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,121 2,063,360
kWh
Electricity Demand $79,408 9,889
kW-mo/yr
Electricity Fees $(-29,713.8) -
Natural Gas $39,637 2,794
MMBtu
LPG $993 1
MMBtu
TOTAL YEARLY COSTS $312,445
RECOMMENDED SAVINGS* $54,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.2176: Increase use of automation $2,600 $1,800 - - $2,600 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,051 $1,365 $765
7,111
kWh
$286
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,078 - $2,001
18,585
kWh
$77
-
kW-mo/yr
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $7,848 $15,200 $4,427
41,144
kWh
$3,421
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $507 $800 $507
4,710
kWh
- - -
06 2.7135: Install occupancy sensors $2,195 $7,200 $2,053
19,059
kWh
$142
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,471 $10,650 $1,077
9,790
kWh
$394
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,596 $16,800 $1,900
17,270
kWh
$696
-
kW-mo/yr
- -
09 2.4239: Eliminate or reduce compressed air usage $3,406 $2,250 $2,312
21,485
kWh
$1,094
-
kW-mo/yr
- -
10 4.454: Modify startup/shutdown times $10,400 $3,600 - - $10,400 -
11 4.122: Develop standard procedures to improve internal yields $20,020 $3,100 - - - $20,020
TOTAL RECOMMENDED $54,172 $62,765 $15,042
139,154
kWh
$6,110
-
kW-mo/yr
$13,000 $20,020
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs