| Assessment Year | 2026 |
|---|---|
| Principal Product | custom molded plastic parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 50 |
| Plant Area |
100,000
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $222,121 | 2,063,360 |
kWh
|
$0.11 |
| Electricity Demand | $79,408 | 9,889 |
kW-mo/yr
|
$8.03 |
| Electricity Fees | $(-29,713.8) | - |
|
- |
| Natural Gas | $39,637 | 2,794 |
MMBtu
|
$14.19 |
| LPG | $993 | 1 |
MMBtu
|
$735.44 |
| TOTAL YEARLY COSTS | $312,445 | |||
| RECOMMENDED SAVINGS* | $54,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.2176: Increase use of automation | $2,600 | $1,800 | - | - | $2,600 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,051 | $1,365 |
$765
7,111
kWh
|
$286
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,078 | - |
$2,001
18,585
kWh
|
$77
-
kW-mo/yr
|
- | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,848 | $15,200 |
$4,427
41,144
kWh
|
$3,421
-
kW-mo/yr
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $507 | $800 |
$507
4,710
kWh
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $2,195 | $7,200 |
$2,053
19,059
kWh
|
$142
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,471 | $10,650 |
$1,077
9,790
kWh
|
$394
-
kW-mo/yr
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,596 | $16,800 |
$1,900
17,270
kWh
|
$696
-
kW-mo/yr
|
- | - | |
| 09 | 2.4239: Eliminate or reduce compressed air usage | $3,406 | $2,250 |
$2,312
21,485
kWh
|
$1,094
-
kW-mo/yr
|
- | - | |
| 10 | 4.454: Modify startup/shutdown times | $10,400 | $3,600 | - | - | $10,400 | - | |
| 11 | 4.122: Develop standard procedures to improve internal yields | $20,020 | $3,100 | - | - | - | $20,020 | |
| TOTAL RECOMMENDED | $54,172 | $62,765 |
$15,042
139,154
kWh
|
$6,110
-
kW-mo/yr
|
$13,000 | $20,020 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs