Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,280

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0061 #01 Y:2026 Use / purchase optimum sized compressor $150,000 $35,400
MU0086 #10 Y:2026 Install replacement doors $222 $479
MU0086 #09 Y:2026 Insulate glazing, walls, ceilings, and roofs $299 $105
MU0086 #08 Y:2026 Improve air circulation with destratification fans / other methods $2,199 $7,543
MU0086 #07 Y:2026 Reduce illumination to minimum necessary levels $1,434 -
MU0086 #06 Y:2026 Use or replace with energy efficient substitutes $465 $1,800
MU0086 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,874 $500
MU0086 #04 Y:2026 Recover heat from exhausted steam, hot air or hot water $10,899 $19,446
MU0086 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $256 $2,836
MU0086 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $17,017 $10,890
MU0086 #01 Y:2026 Increase use of automation $21,996 $3,808
WM0259 #05 Y:2026 Install spectral reflectors / delamp $265 -
WM0259 #04 Y:2026 Install adequate dryers on air lines to eliminate blowdown $1,514 $1,508
WM0259 #03 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $24,491 $20,000
WM0259 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $46,427 $10,000
WM0259 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $134,432 -
UL2603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,696 $20,685
UL2603 #06 Y:2026 Reduce illumination to minimum necessary levels $7,891 -
UL2603 #05 Y:2026 Use solar heat to make electricty $102,792 $1,093,593
UL2603 #04 Y:2026 Lower ceiling to reduce conditioned space $16,549 $21,600