Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,241

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0594 #04 Y:2026 Reduce space conditioning during non-working hours $244 -
SU0594 #03 Y:2026 Apply for tax-free status for energy purchases $192 -
SU0594 #02 Y:2026 Eliminate or reduce compressed air usage $2,031 -
SU0594 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,040 -
UW2602 #06 Y:2026 Optimize plant power factor $61,576 $37,084
UW2602 #05 Y:2026 Repair and eliminate steam leaks $38,800 $7,287
UW2602 #04 Y:2026 Use or replace with energy efficient substitutes $10,764 $32,940
UW2602 #03 Y:2026 Install occupancy sensors $20,293 $15,688
UW2602 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,269 $7,520
UW2602 #01 Y:2026 Burn wood by-products for heat $362,644 $6,038,074
MS0467 #04 Y:2026 Optimize plant power factor $18,243 $121,000
MS0467 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $10,936 -
MS0467 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $5,879 $1,680
MS0467 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,030 $2,244
WM0260 #05 Y:2026 Repair and eliminate steam leaks $128 $377
WM0260 #04 Y:2026 Install occupancy sensors $1,611 $300
WM0260 #03 Y:2026 Lower temperature during the winter season and vice-versa $1,623 -
WM0260 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,830 $6,760
WM0260 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $20,053 -
NT0062 #06 Y:2026 Lower temperature during the winter season and vice-versa $803 -