ITAC Assessment: TT0355
ITAC logo
ITAC Assessment: TT0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Carpet Underlay
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 49
Plant Area 221,000
ft2
Annual Production 140,400
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,714 2,948,091
kWh
Electricity Demand $42,890 12,961
kW-mo/yr
Electricity Fees $34,970 -
Natural Gas $77,507 6,520
MMBtu
Other Gas $20,419 1,096
MMBtu
Waste Disposal Costs
Water Usage $4,263 521
Tgal
Water Disposal $19,239 521
Tgal
TOTAL YEARLY COSTS $420,002
RECOMMENDED SAVINGS* $118,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $285 $272
3,635
kWh
- -
02 2.8114: Change rate schedules or other changes in utility service $35,295 $480 - - $35,295
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,101 $390 $3,101
41,403
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $1,904 $10,000 $1,904
25,425
kWh
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $6,774 $1,520 $6,774
90,439
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,381 $60 $2,381
31,782
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $697 $150 $697
9,310
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,547 $80,240 $24,547
327,700
kWh
- -
09 2.4322: Use or replace with energy efficient substitutes $39,727 $335,000 $39,727
530,400
kWh
- -
10 2.4239: Eliminate or reduce compressed air usage $631 $1,800 $631
8,418
kWh
- -
11 2.2511: Insulate bare equipment $121 $399 - $121
-
MMBtu
-
12 2.4157: Establish a predictive maintenance program $2,703 $6,000 - - $2,703
TOTAL RECOMMENDED $118,152 $436,324 $80,033
1,068,513
kWh
$121
-
MMBtu
$37,998
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs