167,754
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0988 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $91,923 | $962,674 | |
| GT0988 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $10,998 | $47,093 | |
| GT0988 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $598 | $200 | |
| GT0988 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $18,172 | $1,850 | |
| GT0988 #02 Y:2024 | 02 | 2024 | Chill water to the highest temperature possible | $5,947 | $400 | |
| GT0988 #01 Y:2024 | 01 | 2024 | Apply for tax-free status for energy purchases | $14,344 | $800 | |
| WM0229 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $267 | $129 | |
| WM0229 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $476 | $460 | |
| WM0229 #04 Y:2024 | 04 | 2024 | Reduce space conditioning during non-working hours | $1,572 | - | |
| WM0229 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $2,880 | $1,455 | |
| WM0229 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $4,336 | - | |
| WM0229 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,865 | $3,500 | |
| MU0060 #10 Y:2024 | 10 | 2024 | Use solar heat to make electricty | $42,322 | $490,355 | |
| MU0060 #09 Y:2024 | 09 | 2024 | Use or replace with energy efficient substitutes | $14,407 | $66,000 | |
| MU0060 #08 Y:2024 | 08 | 2024 | Replace fossil fuel equipment with electrical equipment | $1,220 | $5,000 | |
| MU0060 #07 Y:2024 | 07 | 2024 | Use squeegees, mops, and vacuums for floor cleaning | $1,733 | $5,000 | |
| MU0060 #06 Y:2024 | 06 | 2024 | Use automatic cleaning equipment | $44,873 | $110,000 | |
| MU0060 #05 Y:2024 | 05 | 2024 | Upgrade obsolete equipment | $76,249 | $151,800 | |
| MU0060 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $19,778 | $24,085 | |
| MU0060 #03 Y:2024 | 03 | 2024 | Recover heat from exhausted steam, hot air or hot water | $1,517 | $1,184 |