ITAC Assessment: SJ0030
ITAC logo
ITAC Assessment: SJ0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plastic bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 480,000
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,815,896 22,272,141
kWh
Electricity Demand $1,075,488 51,777
kW-mo/yr
Natural Gas $2,749 134
MMBtu
LPG $20,293 1,133
MMBtu
TOTAL YEARLY COSTS $2,914,426
RECOMMENDED SAVINGS* $755,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $630,866 $6,247,450 $623,517
7,603,868
kWh
$7,349
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $18,627 $195,217 $2,869
34,984
kWh
$15,758
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,538 $18,930 $11,052
134,784
kWh
$4,486
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,245 - $15,245
185,919
kWh
-
05 2.6218: Turn off equipment when not in use $136 $1,200 $136
1,654
kWh
-
06 2.2621: Modify refrigeration system to operate at a lower pressure $70,368 $30,719 $70,368
858,147
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,287 - $4,287
52,277
kWh
-
08 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $663 $4,755 $663
8,085
kWh
-
TOTAL RECOMMENDED $755,730 $6,498,271 $728,137
8,879,718
kWh
$27,593
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs