Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,754

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0219 #06 Y:2025 Install compressor air intakes in coolest locations $2,631 $974
IP0219 #05 Y:2025 Use solar heat to make electricty $92,696 $900,763
IP0219 #04 Y:2025 Recover waste heat from equipment $5,372 $1,319
IP0219 #03 Y:2025 Turn off equipment when not in use $9,717 -
IP0219 #02 Y:2025 Recharge batteries on during off-peak demand periods $9,724 -
IP0219 #01 Y:2025 Moderate cooling tower outlet temperature $73,439 -
MI0471 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $921 $1,747
MI0471 #06 Y:2025 Insulate bare equipment $212 $346
MI0471 #05 Y:2025 Close holes and openings in building such as broken windows $269 $389
MI0471 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $13,010 $13,222
MI0471 #03 Y:2025 Optimize plant power factor $7,230 $7,058
MI0471 #02 Y:2025 Install occupancy sensors $1,132 $703
MI0471 #01 Y:2025 Change rate schedules or other changes in utility service $1,896 $104
GT1003 #10 Y:2025 Use solar heat to make electricty $116,617 $694,521
GT1003 #09 Y:2025 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $107,574 $414,000
GT1003 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $18,909 $61,212
GT1003 #07 Y:2025 Repair and eliminate steam leaks $1,657 $1,850
GT1003 #06 Y:2025 Turn off equipment during breaks, reduce operating time $1,390 $1,495
GT1003 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,175 $1,850
GT1003 #04 Y:2025 Reduce space conditioning during non-working hours $1,117 $600