Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,754

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0464 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,762 $2,243
MS0464 #03 Y:2026 Eliminate/reduce an operation $1,157 -
MS0464 #02 Y:2026 Air condition only space necessary $65,105 $17,298
MS0464 #01 Y:2026 Optimize plant power factor $14,662 $50,000
IC0343 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $554 $7,901
IC0343 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $316 $1,477
IC0343 #07 Y:2026 Use radiant heater for spot heating $700 $10,000
IC0343 #06 Y:2026 Use solar heat to make electricty $89,645 $370,298
IC0343 #05 Y:2026 Turn off equipment during breaks, reduce operating time $2,730 -
IC0343 #04 Y:2026 Insulate bare equipment $1,244 $1,900
IC0343 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $573 $60
IC0343 #02 Y:2026 Close holes and openings in building such as broken windows $33 $25
IC0343 #01 Y:2026 Minimize use of outside make-up air for ventilation except when used for economizer cycle $8,753 $8,000
IC0342 #09 Y:2026 Minimize use of outside make-up air for ventilation except when used for economizer cycle $4,434 $3,000
IC0342 #08 Y:2026 Use most efficient type of electric motors $6,761 $4,672
IC0342 #07 Y:2026 Use solar heat to make electricty $20,676 $94,017
IC0342 #06 Y:2026 Install timers and/or thermostats $7,519 $2,774
IC0342 #05 Y:2026 Install occupancy sensors $1,133 $900
IC0342 #04 Y:2026 Insulate bare equipment $1,026 $1,353
IC0342 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,347 $5,016